Charging Machines
From scrap heap into the melting furnace
Features & benefits:
- Reliable construction, especially designed for casthouse conditions
- Highest loading capacity
- Short charging time, approx. 2 minutes
- Reduction in overall melting time
- Less energy losses
- Integrated load cells
- Low repair & maintenance costs
- Higher safety standard
- Remote control
Specifications:
- Loading capacity up to 20 tons
- Container width up to 7 meters for long scrap

Charging machine

Profile scrap in furnace

Charging machine with fume hood

